Before the Federal Communications Commission Washington, DBefore the Federal Communications Commission Washington, D
Petition of Qwest Communications International Inc for Special Temporary Authority and Waiver
58.84 Kb. 1
read
For the Environmental Planning Services PilotFor the Environmental Planning Services Pilot
Environmental assessment for the proposed 2015 environmental planning services pilot, fort lee, virginia
194.61 Kb. 6
read
Review for proposed activitiesReview for proposed activities
The entire project, including the reuse will be considered in the environmental review. Factors that indicate that the future site reuse can reasonably be considered to be known include the following
Review 88.25 Kb. 1
read
Procedures for Implementing Reasonable Accommodation in Programs and Services for Individuals with Disabilities table of contentsProcedures for Implementing Reasonable Accommodation in Programs and Services for Individuals with Disabilities table of contents
Procedures for Implementing Reasonable Accommodation in Programs and Services for Individuals with Disabilities
83.51 Kb. 1
read
Mandate templateMandate template
Project title: ‘‘’ art for empolyment and inclusion’’ Erasmus+ Mandate : February 2017
23.82 Kb. 1
read
Environmental Impact Report/Environmental Impact Statement Annotated OutlineEnvironmental Impact Report/Environmental Impact Statement Annotated Outline
Text color key: Black = required headings Blue = instructions/guidance to be deleted Red = boilerplate text Underlined text: Internet or Intranet Web links Purple = sample text Orange = special attention
31.98 Kb. 1
read
U. S. Fish and wildlife service refuge manualU. S. Fish and wildlife service refuge manual
Scope. This chapter applies to the control of all animal
90.02 Kb. 1
read
Alternatives analysis 1 introductionAlternatives analysis 1 introduction
The Airport Environmental Handbook states in part that the alternatives to be considered in the preparation of an ea should be considered “… to the degree commensurate with the nature of the proposed action.”
15.64 Kb. 1
read
Paulding Northwest Atlanta Airport Draft Environmental Assessment chapter need and purposePaulding Northwest Atlanta Airport Draft Environmental Assessment chapter need and purpose
Instrument Landing System (ils), a 23,000 square foot terminal building, aircraft storage hangars, aircraft tie-downs, and an airport fueling system (fuel farm)
37.4 Kb. 1
read
Bz ceqr#03-bsa-080KBz ceqr#03-bsa-080K
Subject application November 13, 2002 under Z. R. §72-21 to permit the legalization of residential occupancy in a one story, four unit building, which is located within an M1-1 zoning district, which is contrary to Z. R. §42‑00
19.87 Kb. 1
read
Bz ceqr #03-bsa-016KBz ceqr #03-bsa-016K
Premises affected 121/35 Court Street, 211/35 Atlantic Avenue and 204/24 State Street, Borough of Brooklyn
24.71 Kb. 1
read
Federal RegisterFederal Register
Board for International Food and Agricultural Development; One Hundred and Sixtieth Meeting; Notice of Meeting
52.83 Kb. 1
read
South Carolina General Assembly 115th Session, 2003-2004 S. 543 Status informationSouth Carolina General Assembly 115th Session, 2003-2004 S. 543 Status information
Currently residing in the House Committee on Agriculture, Natural Resources and Environmental Affairs
23.27 Kb. 1
read
Incidental to naval explosive ordnance disposal school training operations at eglin air force base, floridaIncidental to naval explosive ordnance disposal school training operations at eglin air force base, florida
Environmental assessment on the promulgation of regulations and the issuance of a letter(S) of
344.59 Kb. 4
read
Draft Terrestrial Resources Biological Assessment oregon highway 62 corridor solutions projectDraft Terrestrial Resources Biological Assessment oregon highway 62 corridor solutions project
Gis analysis of Identified vpc habitats in Relation to the Project Area and Action Area 1
28.52 Kb. 1
read

  1   2




The database is protected by copyright ©ininet.org 2024
send message

    Main page